Sunday 1 March 2015

Gyprock done (November 2014)

Apologies for not keeping this blog up to date, and a lot has happened since I last wrote on this blog.

Early November had the guys in from Ornamental Contracting come to put up all the gyprock, square set throughout the house.

Had 13mm multistop (similar to soundcheck/firecheck) gyprock put all through the home theatre room, which I may or may not at a later date add another layer of 10mm with green glue inbetween the sheets.

The rest of the house is the normal 10mm gyprock with 6mm villaboard in the wet areas like bathrooms and laundry.

Under the back patio (alfresco) and front verandah I've had done with 13mm water resistant gyprock, as it looks a whole lot better the fibro with plastic joins all the way through it.

During the following after they put it up, and another crew came in the did the finishing off to bring it up to painting ready.

One thing they would rather I didn't do, was not to cut holes in the walls for the powerpoints/light switches, as it makes it a lot harder to do the joints and sanding. ...now they tell me. :)